Ga naar de inhoud
Naar homepage van openbaarmakingen, onderdeel van Rijkswaterstaat - Ministerie van Infrastructuur en WaterstaatRijkswaterstaatMinisterie van Infrastructuur en Waterstaat
Direct naar
  • over dit publicatieplatform
Rijkswaterstaat Publicatie Platform
  • Homepage
  • Ter inzage
  • Open overheid
  • Overige publicaties
  • over dit publicatieplatform
  1. Homepage ›
  2. Open overheid ›
  3. Onderzoeksrapporten ›
  4. BOSS-STM : phase 2: model specification

BOSS-STM : phase 2: model specification

Documents part of the second phase in the further development of STM (Statistical Traffic Model), as part of the START system (Simulation of Traffic for Application in Real-Time), to develop START into a decision support system called BOSS (BeslissingsOnderSteunend Systeem). The model specification contains information on the functions prediction, tracking, short link problem, on/off-ramps, speed equation. The specifications are followed by a calibration methodology.

Datum rapport
1 januari 1998
Auteur
Hague Consulting Group (HCG); H.J.M. van Grol
Uitgever
HCG.
Annotatie
50 p.
ill.
Research for the Ministry of Transport, Public Works and Water Management, Rijkswaterstaat, Transport Research Centre = Adviesdienst Verkeer en Vervoer (RWS, AVV)
Project management D. Jasperse, W.J. Knibbe, F. Middelham, S.A. Smulders
Documentnummer
185502
  • BOSS_STM__phase_2__model_specification_404682.pdf (pdf, 3.2 MB)



Over deze site

  • Over dit publicatieplatform
  • Privacy
  • Copyright
  • Toegankelijkheid
  • Archief van deze site

Snel naar

  • Rijkswaterstaat Homepage
  • Rijkswaterstaat Standaarden
  • Rijkswaterstaat Beeldarchief
  • Rijkswaterstaat Data
  • Platform Participatie
  • Officiële bekendmakingen

Contact

Rijkswaterstaat kunt u bereiken via telefoon 0800-8002

of  stel hier online een vraag