FEWS-NL : acceptance testing document
Describes the tests that need to be carried out on the operation of the Live System.
Describes the tests that need to be carried out on the operation of the Live System.
3 dln. Part 1: Live System Part 2: Implementation - Rhine and Meuse Part 3: Master Controller Prepared for [Ministerie van Verkeer en Waterstaat,] Rijkswaterstaat, Rijksinstituut voor Integraal Zoetwaterbeheer en Afvalwaterbehandeling (RWS, RIZA) WL-report Q4025.00 FEWS = Flood Early Warning System