Ga naar de inhoud
Naar homepage van openbaarmakingen, onderdeel van Rijkswaterstaat - Ministerie van Infrastructuur en WaterstaatRijkswaterstaatMinisterie van Infrastructuur en Waterstaat
Direct naar
  • over dit publicatieplatform
Rijkswaterstaat Publicatie Platform
  • Homepage
  • Open overheid
  • Overige publicaties
  • Ter inzage
  • Besluiten
  • over dit publicatieplatform
  1. Homepage ›
  2. Open overheid ›
  3. Onderzoeksrapporten ›
  4. Feasibility study Suspended buoyant tubes : phase 2

Feasibility study Suspended buoyant tubes : phase 2

This report contains the results of phase 2 of a feasibility study of the concept of a Submerged Tube Bridge (S.T.B.). This concept involves a strait-crossing by means of a submerged tube, free above the bottom, and supported by its own buoyancy. Long spans can be achieved by either fixed bottom-mounted piers, surface-pontoons and/or anchor cables. The cross section of the tube serves to withstand external water pressure and to accomodate the traffic.

Datum rapport
1 januari 1987
Auteur
Delta Marine Consultants, Delft University of Technology = Technische Universiteit Delft, Dutch Ministry of Public Works - Ministerie van Verkeer en Waterstaat
Uitgever
Delta Marine Consultants.
Annotatie

[100] p.
ill., tab.
Report 999014 - r - 02 (rev.1)

Documentnummer
156806
  • 156806.pdf (pdf, 22 MB)



Over deze site

  • Over dit publicatieplatform
  • Copyright
  • Toegankelijkheid
  • Privacy
  • Archief van deze site

Snel naar

  • Rijkswaterstaat Homepage
  • Rijkswaterstaat Standaarden
  • Rijkswaterstaat Beeldarchief
  • Rijkswaterstaat Data
  • Platform Participatie
  • Officiële bekendmakingen

Contact

Rijkswaterstaat kunt u bereiken via telefoon 0800-8002

of  stel hier online een vraag