Using the Logsum as an Evaluation Measure : literature and case study

Presentation of the outcome of a project, consisting of two parts: -a review of the literature on the of logsums as a measure of consumer surplus change in project assessment; and -a case study with the LMS in which three methods are compared for a specific project (Rondje Randstad: additional high speed and intercity trains connecting the four main cities in the Randstad: Amsterdam, The Hague, Rotteram and Utrecht). The tree methods are: -the classic CBA approach; -the improved classic CBA approach; and -the logsum approach.

Datum rapport
1 mei 2005
Auteurs
Jong, G. de, Koopmans, C., Kroes, E., Pieters, M.
Auteur
G. de Jong, M. Pieters, A. Daly, I. Graafland, E. Kroes, C. Koopmans; RAND Europe, SEO
Uitgever
Rand Europe.
Annotatie
77 p.
ill.
With ref.
Reportno.: WR-275-AVV
Projectno.:04125
Report prepared for: AVV Transport Research Centre
project management A. van der Hoorn