Technical and environmental audit of the Aeroisla-project Buenos Aires, Argentina : part two, extensive audit report
In chapter 2 the terms of reference for the audit have been set out. In chapter 3 purpose and method has been described. The major observations are presented in chapter 4 and finally, in chapter 5 conclusions are presented.
- Datum rapport
- 30 oktober 1995
- Auteur
- Prepared by G.A. Beaufort and H.M. Sarink; Ministry of Transport, Public Works and Water Management, Directorate-General for Public Works and Water Management (RWS, BD), Hydraulic Engineering Branch
- Uitgever
- RWS, BD.
- Annotatie
-
[15] p.
fig.
Doc.nr. VLAR-M-95053 - Documentnummer
- 383150