New developements in tunnel-lining design : the dutch aproach : Japan, 16th and 19th July 1999

Contains: Introduction of the speakers / W.L. Leenertse, K.J. Bakker (etc.); Tunnel boring projects in the Netherlands / W.L. Leendertse; With 300 km/hour under the Green Heart of Holland! A tunnelling challenge / W.L. Leendertse, H. Burger; Ground deformations due to the boring of the Second Heinenoord Tunnel / E.P. van Jaarsveld, J.W. Plekkenpol, C.A. Messemaeckers van de Graaf; Monitoring pilot projects on bored tunnelling; the Second Heinenoord Tunnel and the Botlek Rail Tunnel / K.J. Bakker (etc.) ; Stresses and strains in segmented lining, at the Second Heinenoord Tunnel evaluation of monitoring and numerical analyses / K.J. Bakker (etc.); Analysis of tunnel lining behaviour in soft soil during the construction stage, the Second Heinenoord Tunnel / G.P.C. van Oosterhout (etc.); Influence of packing materials on tunnel lining behavior / E.J. van der Horst, C. van der Veen; Three-dimensional structural analyses of the shield driven tunnel 'Groene Hart', high speed line south / C.B.M. Blom, E.J. van der Horst, P.S. Jovanovic / Full scale structural test facility for tunnel linings / P.C. van Staalduinen

Datum rapport
1 juli 1999
Auteurs
Leendertse, W.
Auteur
W. Leendertse (etc.); Ministerie van Verkeer en Waterstaat, Rijkswaterstaat, Rijkswaterstaat Bouwdienst (RWS, BD)
Annotatie
84 p.
ill.
Documentnummer
354116