This report contains the results of phase 2 of a feasibility study of the concept of a Submerged Tube Bridge (S.T.B.). This concept involves a strait-crossing by means of a submerged tube, free above the bottom, and supported by its own buoyancy. Long spans can be achieved by either fixed ...
auteur(s): Delta Marine Consultants, Delft University of Technology = Technische Universiteit Delft, Dutch Ministry of Public Works - Ministerie van Verkeer en Waterstaat