In chapter 2 the terms of reference for the audit will be set out. In chapter 3 the way the project is in-surveyed in this first report is described. the major observations are presented in chapter 4. finally, in chapter 5, recommendations and suggestions are presented.
auteur(s): Prepared by G.A. Beaufort and H.M. Sarink; Ministry of Transport, Public Works and Water Management, Directorate-General for Public Works and Water Management (RWS, BD), Hydraulic Engineering Branch