Dynamic Route Guidance Systems : revised final report
This report has been prepared by Castle Rock Consultants (CRC) as a result of work carried out on the Dynamic Route Guidance Systems project for the Rijkswaterstaat. The project was divided into four tasks, as follows: Review of existing route guidance systems; system analyses from the driver perspective; Systems analyses from the road authority perspective; and Expectations for system implementation
- Datum rapport
- 1 juli 1990
- Auteur
- Castle Rocks Consultants (CRC); Rijkswaterstaat Dienst Verkeerskunde
- Uitgever
- CRC.
- Annotatie
-
176 p.
ill.
With sum.
Prepared for: Ministerie van Verkeer en Waterstaat, Rijkswaterstaat (RWS), Dienst Verkeerskunde (DVK) - Documentnummer
- 395614