Technical and environmental audit of the Aeroisla-project Buenos Aires, Argentina : part one, in-survey
In chapter 2 the terms of reference for the audit will be set out. In chapter 3 the way the project is in-surveyed in this first report is described. the major observations are presented in chapter 4. finally, in chapter 5, recommendations and suggestions are presented.
- Datum rapport
- 17 februari 1995
- Auteur
- Prepared by G.A. Beaufort and H.M. Sarink; Ministry of Transport, Public Works and Water Management, Directorate-General for Public Works and Water Management (RWS, BD), Hydraulic Engineering Branch
- Uitgever
- RWS, BD.
- Annotatie
-
36 p.
fig.
Doc.nr. VLAR-M-95022 - Documentnummer
- 383149